The bathroom plumbing system is one of the ordinary maintenance interventions. But even if it does not fall within the classification of “complex” interventions. It must be carried out by diligently following all the techniques provided for by the relevant legal regulations.
Otherwise you could run into unpleasant inconveniences.
Below you will find some useful tips to better implement the plumbing system in your bathroom. Thanks also to the help of the technicians, who gave us valuable technical information in the plumbing field to draft the article.
Plumbing installation: The first Steps to Follow:
First you have to understand what exactly you want to achieve. Because if you intend to redo the whole bathroom from scratch. Replacing all the loading and unloading pipes you will have to budget a higher figure than a simple and faster replacement of the sanitary ware.
Furthermore, especially those who live in a condominium and do not like having to remove the tiles, the screed and restore everything, often opt for the construction of an external plumbing system (therefore visible).
In any case, you will have to take the measurements of the environment. It is important to check the distance between the bathroom fixtures and to make the room functional.
Therefore, before starting the renovation. It is necessary to prepare a diagram of the bathroom plumbing that takes into account not only the arrangement of the sanitary ware, the shower or tub, the radiator and the sink. Must also include the position of the drains and connections. hot and cold water.
What is the plumbing scheme and how is the plumbing system of a bathroom made?
It is relating to the drainage slope, since a low slope level may not allow the drainage to flow correctly.
By plumbing system we do not mean the simple replacement of the sanitary ware (toilet and bidet). Sink cabinet or shower tray. By system we mean all the water supply and discharge pipes.
The bathroom plumbing system is a portion of the entire system of the entire apartment. This is why the loading system (the one that carries the water to the bathroom) will have to reconnect to a collector. Therefore to the deviation from the main meter bring water to the bathroom.
The branch loading system is one of the most common systems used during renovations. Which involves the interception of the main piping and the creation of a path that will lead the water into the bathroom.
The drain system, on the other hand, is usually made with a double pipe (as an alternative to the one with a single pipe). As it is the most hygienic choice. Since it separates the dark waters from the clear ones.
You must also pay particular attention to the installation of the breather pipe, which is important in order not to have bad smells in the bathroom. So we suggest you ask the plumber to install a pipe with a large capacity.
What are the costs to be incurred for the plumbing of a Bathroom:
Depending on the type of work you intend to perform. You should know that for the complete renovation of a bathroom, in addition to the assistance of a plumber, that of a bricklayer will also be required.
The plumber will remove the existing sanitary ware and build the new system. Drafting and connection of the water inlet and outlet pipes and installation of all accessories. Learn more about the plumbing course
Therefore, if you were to make a list of the costs to be incurred, it could be summarized as follows:
- Demolition and disposal of sanitary ware, flooring and cladding (bricklayer and plumber);
- Creation of the traces as per the plumber’s project (bricklayer);
- Construction of the thermo-water system, then loading and unloading water, in addition to the piping for the (hydraulic) radiator;
- Construction of masonry works, restoration of plaster, installation of floors and coverings (bricklayer);
installation of sanitary ware, radiators and taps (plumbing).